New housing estates 00 [ Cooper Lane estate
(1933 site of), Bargate Court Barrack Street (1936 council
flats), Union Street (1938 council flats), Ketts Hill (1947
pre-fabs) ]
New housing estates 01 [ Heartsease Lane,
Harvey Lane ]
As it was seen that all the land available in the city for house-building would be utilised within a few years, and area to the north-east (including the old Mousehold Aerodrome site) was in 1950 brought within the city boundary. Before houses could be erected, arrangements for linking the site with the sewerage system had to be made, and in 1953 tunnelling began in Harvey Lane for the surface drainage. Cranes in Harvey Lane were at the heads of shafts connecting with the tunnel, and were used in the removal of earth, and the lowering of the pre-cast concrete segments used in the formation of the drain walls.
New housing estates 02 [ Heartsease Estate site
1953 ]
New housing estates 03 [ Aldersons Place
Queens Road (1959-60), Coach and Horses Row Union Street
(1961), Midland Street flats, Woodrow Pilling park (temporary
wooden chalets 1990 to house tenants of neighbouring estate
whilst their permanent homes were being underpinned) ]
Text and photographs copyright George Plunkett